Phone: +386 1 561 26 34
Fax: +386 1 561 31 65
GSM: +386 41 626 889
HPP Ceršak
Regulated vertical Francis turbine in an open flume
H= 5,4 m
Q= 8,0 m3/s
P= 394 kW
On the Mura river we have implemented, supplied and installed a new generator, multiplier and turbine shaft for the investor of the Dravske elektrarne Maribor (DEM).
In addition to the mechanical equipment in the powerplant, we also supplied an electrical appliance.
We improved guiding vanes mechanism, it's adjustable.
The project was completed in 2018.

