Double regulated Kaplan turbine
H= 5,4 m
Q= 8 m3/s
P=394 kW
For our customer Savske Elektrarne Ljubljana d.o.o. (SEL), we designed, supplied and installed all the electrical and mechanical equipment for a powerplant on the Sava Dolinka river, complete from the concept design to facility commissioning.
Turbine is double regulated vertical Kaplan turbine with concrete spiral. The turbine is a dual regulated, which means that, depending on the water flow as the leading and driving vanes in accordance changing.
The project was completed in 2019.