Horizontalna Francis turbina
H= 20,2 m
Q= 1,25 m3/s
P= 225 kW
For the investor Hiden d.o.o., we replaced one of the two old Francis turbines with a new, more powerful Francis turbine on the river Kamniška Bistrica.
On the existing spiral, we installed a new turbine, new generator, seal, guiding vanes mechanism. After the revitalization of KIK Kamnik 2, no more personnel are required for the optimal regulation of the turbine, the shutdown and the start of the turbine.
We supplied and installed complete electrical and mechanical equipment in the powerplant, from the conceptual design to the launch.
The project was completed at the beginning of 2018.