Francis turbine
H = 29.5 m
Q = 1.7 m3/s
P = 405 kW
For our customer, the Soške elektrarne Nova Gorica utility company, we carried out revitalisation of the Možnica SHPP. In the scope of this project, the guide vane section was reconstructed to accommodate self-lubricating bearings. We also replaced the worn out runner with a new one. We also restored the turbine thrust bearing.