Francis turbine in a shaft
H = 3 m
Q = 2 x 2.5 m3/s
P = 2 x 55 kW
The customer constructed a small hydro power plant in an old abandoned water-mill. His wish was to renew the mill and restore its operation. The project was undertaken to restore the old mill to operation in parallel with the SHPP.