Saxo tubular turbine
H = 11.7 m
Q= 2.5 m3/s
P= 250 kW
n = 750 rpm
For the investor, SOŠKE ELEKTRARNE NOVA GORICA, we are constructing a biologically minimum set on the dam of Ajba, which serves to capture water for HPP Plave on the Soča river. The set features a non-governed Saxo tubular turbine. The set control and shut-down will be implemented by means of a damper upstream of the turbine. Alongside the turbine, a bypass line will be provided to maintain a biologically sustainable flow rate of the Soča under all circumstances in the section between the Ajba dam and HPP Plave.